TEL3 FDAS Project Phases


Phase 1 : Initial Checkup of Electrical System of FDAS

Date Started : 

Scope of Work :

Findings :

Some detectors are unpowered hence to move forward in the checking and testing of the other detectors the lack of power must be addressed first.

Completion Report?


Phase 2 : Addressing the No-Power Issues of detectors

Date Started : 

Scope of Work :

Findings :

As power lines have been corrected to be able to power up the detectors if was found out that the original and sole power booster is not enough to power all the now active detectors.

Proposed Correction : Additional Power Boosters

Completion Report?


Phase 3 : Addressing the Bad System Design with Additional Power Boosters

Date Started : 

Scope of Work :

Findings : As additional power boosters provided enough power to the detectors troubles are now reported by the FDAS panel and have to be addressed one by one

Proposed Correction :  Preventive Maintenance

Completion Report?

Phase 4 : Preventive Maintenance (ongoing)